Shipbuilding is a complex affair, not least because of the huge size and engineering sophistication of the final product. That's even more true of warships, like Bath Iron Works' surface combatants. BIW builds the most advanced warships in the world, and the company has made huge strides in the efficiency, cost-effectiveness and precision of its methods in the past decade or so. Here we'll give you a high-level overview of what we do, and why.

Design & Engineering

We've been leaders in naval shipbuilding for over 100 years, and that's right where we intend to stay. BIW is the undisputed leader in building surface combatants in the United States.
    
    We've made huge changes in our construction methods in the past decade. With them have come revolutionary changes in our engineering and design. Sophisticated new 3D CAD methods allowed us to develop the design for DDG 1000 to a 'ready to build' level of completion. When full-rate production of the first ship began in February 2009, the fabrication and assembly process for the ship had been tested to the extent that it will be 'built as a follow ship.'

catia slice

    It's unprecedented in US Navy history for a new class of ship to have been given such a head start. We employ bright motivated engineers, led by seasoned pros. BIW is not just any shipyard, and its engineers are the cream of the crop.
    

Fabrication

GDBIW operates two major manufacturing work sites in the West Bath-Brunswick area. One is a structural steel fabrication facility (the Hardings Plant) and the other consists of a climate-controlled Consolidated Warehouse facility and an automated pipe and sheet metal facility which include computer-aided manufacturing capability for steel, pipe and ventilation (the East Brunswick Manufacturing Facility, or EBMF).

ultraunitAs GDBIW's process has become more sophisticated, prefabrication of large and complex units takes place in both locations, prior to transportation by road to the Bath yard

 

 

Assembly

General Dynamics Bath Iron Works shipbuilding takes place at its yard on the Kennebec River, bordering Washington Street at the south end of the city of Bath, Maine. The yard has been in continuous service since the latter end of the 19th century, but has been extensively modernized in recent years. In terms of technology and sophistication, the Bath yard and its neighboring GDBIW manufacturing locations comprise one of the most advanced manufacturing facilities in the United States.

AssemblyX    Facilities at the main plant include a 750-foot drydock, three shipways, three wharves, an outfitting pier, four level-luffing cranes, and covered facilities for pre-outfit and assembly. Also located within the facilities in Maine are engineering, design, ship support, and administrative offices. The shipyard has two principal structural assembly buildings. The larger building measures 15,600 square meters of interior area and houses the Panel Line and 15 Unit Assembly workstations. The smaller building encloses 3,780 square meters and 7 workstations. The Pre-Outfit Building (8,450 square meters) has 16 workstations and is used for installation of distributive systems and operating machinery after the structural units are grit-blasted and painted.

Into the Open: On the Shipways

The shipyard has two separate facility configurations that support the ship assembly (unit erection) and launching process. Both configurations consist of three shipways that can be used for either military or commercial ship construction. Three level-land shipways are the centerpiece of the Land-Level Transfer Facility (LLTF); all three shipways can accommodate ships of 243 meters in length and a maximum beam of 32 meters. The LLTF building positions are serviced by two, track-mounted, 300-ton level-luffing cranes and one, track-mounted, 100-ton level-luffing crane. Operating on an inter-connected rail system grid, all three cranes can be positioned to service any of the three shipways.

LLTF_May10Each ship under construction is paired with operational service towers (OSTs) that permit entry at various intermediate levels on the hull up to deck height, and are equipped with tool cribs, offices, lunchrooms, a freight elevator and other features designed to obviate the need for moving off the job. When ready for launching, ships are translated onto a 28,000-ton lift-capacity floating dry dock, using a purpose-built TTS electro-hydraulic transfer system. Outfit Piers #3 and #4, which are adjacent to the LLTF, are serviced by track-mounted live-boom cranes; one 90-ton and one 60-ton. In addition to the Land-Level Transfer Facility , the shipyard has an outdoor fabrication zone for deckhouses, serviced by a 220-metric ton, track-mounted, level-luffing crane.    

ultraunit

 

Ultrahall

The most recent addition to the yard is the 77,000 square foot Ultrahall, built during 2007 and open for business in February 2008. Here, because of the greater headroom, we can assemble entire keel-to-weather deck sections of ships. With the new DDG 1000, this will mean units weighing up to 4,000 tons can be outfitted in controlled climate conditions. The Ultrahall has been in constant use, housing upsized 'ultrahull' units for the Arleigh Burke class destroyers Spruance and Michael Murphy.  

 

Expansion of Facilities

In August 2011, GDBIW began work on an expansion of its manufacturing facilities. An area in mid-yard occupied by the unused inclined building ways is being cleared, and will be replaced by a level area capable of accommodating hull units, and useful for fitting out and for storage of materials. It will be a highly flexible space that will support efficient construction of DDGs 1001, 1002 and future DDG 51 ships. You can see a before-and-after view in the pictures below.

Included in the project are stations for unit outfitting and storage along with a facility housing support services, lunch room, toolbox storage, etc. It all adds up to a more efficient use of yard space, and a way of reducing costs on future ships.

In addition to this work, we are relocating a pair of Operational Service Towers (OSTs) from Shipway 1 - where DDG 1000 will be assembled - to Shipway 3, nearest to the river. This opportunity arises because modified OSTs have been constructed to handle the larger hull dimensions of the Zumwalt class ships. These expansion projects will be completed by Spring 2012.

 

Support

All of this work can happen, of course, because the process is fed at every stage by purchasing and procurement staff, by liaison with the hundreds of sub-contractors whose equipment is specified for the ship, and through extensive collaboration with the Navy customer.