Bath Iron Works

                        

A GENERAL DYNAMICS COMPANY

                         Appendix G

Title:

SUPPLEMENTAL REQUIREMENTS FOR GENERAL MATERIAL

 

DDG 51 ARLEIGH BURKE CLASS and DDG 1000 ZUMWALT CLASS

 

Rev.

R

Date

9/18/07

 

APPENDIX G HOME

 

REVISION HISTORY

 

SDRL CODE: E001, DRAWINGS:

 

 

a.   Provide 2 copies of drawings showing the following for review and approval in accordance with the delivery schedule shown on the P.O.

-    Title block including drawing number, revision, date and manufacturer’s name.

-    Outline with overall envelope dimensions.

-    Maintenance access envelopes.

-    Location, type and size of interface connections to piping, cabling, foundation, etc.

-    Weight both with and without operating fluids, if applicable.

-    Center of gravity both with and without operating fluids.

-    List of material with quantity and specifications.

-    Sectional assembly identifying parts.

-    Electrical and hydraulic schematic diagrams.

 

b.   Drawings shall be 8-1/2” x 11” size or folded individually in accordian pleated form to an 8-1/2” x 11” size with title block exposed in the lower right hand corner.

 

c.   If for any reason there is a change to the configuration of the material, 2 copies of the revised drawings shall be submitted within 30 days.

 

d.   For equipment that is identical to equipment previously provided by the Seller, and for which the Seller has previously provided drawings, the Seller may choose to submit a certificate of identicality (COI) rather than resubmit the drawings.  The COI shall be submitted on the form provided at the end of this appendix.