In 1985, BIW won the competition for detail design and construction of USS Arleigh Burke (DDG 51), the Lead Ship for the Navy’s most capable class of AEGIS guided missile…
In 1991, BIW celebrated the delivery and commissioning of USS Arleigh Burke (DDG 51), BIW Hull 450, the first of the Aegis destroyers. As shipbuilders took pride in delivery of…
On July 27, 2024, Bath Iron Works observed a powerful milestone as the future USS Patrick Gallagher (DDG 127) was christened on our drydock. The ship is named for Cpl.…
General Dynamics Bath Iron Works celebrated the keel laying of the future USS Patrick Gallagher (DDG 127) on March 30, 2022. The U.S. Navy named the ship in honor of…
Bath Iron Works has built more than half of the US Navy’s Arleigh Burke class Aegis destroyers. The longest-running post-WW2 program of surface combatants, the Burkes are the backbone of…